Difference between revisions of "Subway-to-Elevated Transition"
Jump to navigation
Jump to search
sc4e>Jdenm8 |
sc4e>Jdenm8 |
(No difference)
|
Revision as of 22:58, 11 May 2015
Lot Stats
| |
---|---|
Department
|
|
Lot Size | 3x1 |
Plop Cost | §500 |
Monthly Cost | §20 |
Bulldoze Cost | §50 |
Fire Stage | 2 |
Flammability | 33 |
Power Consumed | 1 MWh/Month |
Maximum Throughput | 2,000 Sims |
Possible Transfers | Elevated Rail Subway |
Air Pollution | 1 over 1 tiles |
Water Pollution | 1 over 1 tiles |
Garbage Pollution | 2 over 0 tiles |
Ploppable Lot | |
---|---|
Download Here | |
N/A | |
General Information | |
Credits | Author: Maxis
|
The Subway-to-Elevated Transition is a Transport building that allows Subway and Elevated Rail services to integrate and form one network. It was added in the Rush Hour Expansion Pack.
It is designed to be placed on top of both a stretch of Subway Network as well on a stub of Elevated Rail, allowing your Sims to transfer from expensive Subways to cheaper Elevated Rail.
|