Difference between revisions of "Medium Landing Strip"

From SC4D Encyclopaedia
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
 
|bulldoze-cost = 1,400
 
|bulldoze-cost = 1,400
 
|construction-time = 80
 
|construction-time = 80
 +
|jobs = 65 R§ <br> 45 R§§ <br>20 R§§§
 
|flammability = 21
 
|flammability = 21
 
|fire = 3
 
|fire = 3
Line 19: Line 20:
 
|garbage-mag = 3
 
|garbage-mag = 3
 
|garbage-spr = 0
 
|garbage-spr = 0
|tswitch-cap = 45,000
+
<!--|tswitch-cap = 45,000-->
 +
|tswitch-cap = 17,500
 
|support =  
 
|support =  
 
|credits = ''
 
|credits = ''
 
|udi = Crop Dusting Plane <br/> Skydiving Plane <br/> Sky Writing Plane <br/> Taxi
 
|udi = Crop Dusting Plane <br/> Skydiving Plane <br/> Sky Writing Plane <br/> Taxi
 +
|goofy-stat = Luggage Lost
 
}}
 
}}
  

Latest revision as of 01:07, 17 September 2022

v  d  e
Lot Stats
Department
Lot Size 6x18
Plop Cost §5,700
Monthly Cost §800
Bulldoze Cost §1,400
Jobs 65 R§
45 R§§
20 R§§§
Fire Stage 3
Flammability 21
Power Consumed 4 MWh/Month
Water Consumed 8 m3/Month
Maximum Throughput 17,500 Sims
Air Pollution 16 over 14 tiles
Water Pollution 3 over 2 tiles
Garbage Pollution 3 over 0 tiles
UDI Vehicles Unlocked Crop Dusting Plane
Skydiving Plane
Sky Writing Plane
Taxi
"Goofy Stat" Luggage Lost
Ploppable Lot
Medium Landing Strip.png
Download Here
N/A
General Information
Credits Author: Maxis

The Medium Landing Strip is a Transport building that provides Air services, designed to provide Commercial CAP Relief.

Airports provide Commercial Office Cap Relief proportional to their Usage.

The Medium Landing Strip is, surprisingly, the midpoint of the Landing Strip-class Airport chain in the game, preceded by the Small Landing Strip and succeeded by the Large Landing Strip.