Difference between revisions of "Large Landing Strip"

From SC4D Encyclopaedia
Jump to navigation Jump to search
sc4e>Jdenm8
(New page: {{Infobox plop |img = {{{image1|{{{img|300px}}}}}} |dl = N/A |author = Maxis |size = 6x18 |type = {{Infobox plop/Transport}} |plop-cost = 20,000 |monthly-...)
 
(4 intermediate revisions by 2 users not shown)
Line 5: Line 5:
 
|size = 6x18
 
|size = 6x18
 
|type = {{Infobox plop/Transport}}
 
|type = {{Infobox plop/Transport}}
|plop-cost = 20,000
+
|plop-cost = 9,700
|monthly-cost = 700
+
|monthly-cost = 1000
 
|bulldoze-cost = 1,800
 
|bulldoze-cost = 1,800
 
|construction-time = 80
 
|construction-time = 80
 +
|jobs = 80 R§ <br> 55 R§§ <br>25 R§§§
 
|flammability = 22
 
|flammability = 22
 
|fire = 3
 
|fire = 3
Line 19: Line 20:
 
|garbage-mag = 4
 
|garbage-mag = 4
 
|garbage-spr = 0
 
|garbage-spr = 0
|tswitch-cap = 50,000 Sims<br/>(NAM Rebalance) 200,000
+
<!--|tswitch-cap = 50,000 Sims<br/>(NAM Rebalance) 200,000-->
 +
|tswitch-cap = 30,600
 
|support =  
 
|support =  
 
|credits = ''
 
|credits = ''
 
|udi = Crop Dusting Plane <br/> Skydiving Plane <br/> Sky Writing Plane <br/> Taxi
 
|udi = Crop Dusting Plane <br/> Skydiving Plane <br/> Sky Writing Plane <br/> Taxi
 +
|goofy-stat = Lost Luggage
 
}}
 
}}
  

Latest revision as of 02:04, 17 September 2022

v  d  e
Lot Stats
Department
Lot Size 6x18
Plop Cost §9,700
Monthly Cost §1000
Bulldoze Cost §1,800
Jobs 80 R§
55 R§§
25 R§§§
Fire Stage 3
Flammability 22
Power Consumed 6 MWh/Month
Water Consumed 10 m3/Month
Maximum Throughput 30,600 Sims
Air Pollution 18 over 14 tiles
Water Pollution 4 over 2 tiles
Garbage Pollution 4 over 0 tiles
UDI Vehicles Unlocked Crop Dusting Plane
Skydiving Plane
Sky Writing Plane
Taxi
"Goofy Stat" Lost Luggage
Ploppable Lot
Large Landing Strip.png
Download Here
N/A
General Information
Credits Author: Maxis

The Large Landing Strip is a Transport building that provides Air services, designed to provide Commercial CAP Relief.

Airports provide Commercial Office Cap Relief proportional to their Usage.

The Large Landing Strip is the final lot in the Landing Strip-class Airport chain, preceded by both the Small Landing Strip and Medium Landing Strip. To further increase capacity, lots in the Municipal Airport chain must be used.