Difference between revisions of "Large Landing Strip"
Jump to navigation
Jump to search
sc4e>Jdenm8 (New page: {{Infobox plop |img = {{{image1|{{{img|300px}}}}}} |dl = N/A |author = Maxis |size = 6x18 |type = {{Infobox plop/Transport}} |plop-cost = 20,000 |monthly-...) |
sc4e>Jdenm8 (New page: {{Infobox plop |img = {{{image1|{{{img|300px}}}}}} |dl = N/A |author = Maxis |size = 6x18 |type = {{Infobox plop/Transport}} |plop-cost = 20,000 |monthly-...) |
(No difference)
|
Revision as of 05:48, 7 February 2014
Lot Stats
| |
---|---|
Department
|
|
Lot Size | 6x18 |
Plop Cost | §20,000 |
Monthly Cost | §700 |
Bulldoze Cost | §1,800 |
Fire Stage | 3 |
Flammability | 22 |
Power Consumed | 6 MWh/Month |
Water Consumed | 10 m3/Month |
Maximum Throughput | 50,000 Sims (NAM Rebalance) 200,000 Sims |
Air Pollution | 18 over 14 tiles |
Water Pollution | 4 over 2 tiles |
Garbage Pollution | 4 over 0 tiles |
UDI Vehicles Unlocked | Crop Dusting Plane Skydiving Plane Sky Writing Plane Taxi |
Ploppable Lot | |
---|---|
Download Here | |
N/A | |
General Information | |
Credits | Author: Maxis
|
The Large Landing Strip is a Transport building that provides Air services, designed to provide Commercial CAP Relief.
Airports provide Commercial Office Cap Relief proportional to their Usage.
The Large Landing Strip is the final lot in the Landing Strip-class Airport chain, preceded by both the Small Landing Strip and Medium Landing Strip. To further increase capacity, lots in the Municipal Airport chain must be used.
|