Difference between revisions of "Subway-to-Elevated Transition"

From SC4D Encyclopaedia
Jump to navigation Jump to search
sc4e>Jdenm8
sc4e>Jdenm8
Line 1: Line 1:
 
{{Infobox plop
 
{{Infobox plop
|img = {{{image1|{{{img|[[Image:Subway-to-Elevated Transition.png|150px]]}}}}}}
+
|img = {{{image1|{{{img|[[Image:Subway-to-Elevated Transition.png|300px]]}}}}}}
 
|dl = N/A
 
|dl = N/A
 
|author = Maxis
 
|author = Maxis

Revision as of 02:30, 12 January 2014

v  d  e
Lot Stats
Lot Size 3x1
Plop Cost §500
Monthly Cost §20
Bulldoze Cost §50
Fire Stage 2
Flammability 33
Power Consumed 1 MWh/Month
Maximum Throughput 2,000 Sims
Possible Transfers Elevated Rail
Subway
Air Pollution 1 over 1 tiles
Water Pollution 1 over 1 tiles
Garbage Pollution 2 over 0 tiles
Ploppable Lot
Subway-to-Elevated Transition.png
Download Here
N/A
General Information
Credits Author: Maxis

The Subway-to-Elevated Transition is a Transport building that allows Subway and Elevated Rail services to integrate and form one network.

It is designed to be placed on top of both a stretch of Subway Network as well on a stub of Elevated Rail, allowing your Sims to transfer from expensive Subways to cheaper Elevated Rail.