Processing Center
Revision as of 04:37, 13 May 2014 by sc4e>Jdenm8
Lot Stats | |
---|---|
General Information | |
Creator | Author: Maxis |
Lot Size | 2x2 |
Tileset | Machinery |
Stage | M2 (One 2x3, One 3x2) M3 (2x2, One 2x3, One 3x2) |
Wealth Level | I§§ |
Density | |
Occupants (§§) | 48 |
Bulldoze Cost | §150 |
Construction | 15 days |
Flammability | 75 |
Fire Stage | 3 |
Power Cons. | 11 MWh |
Water Cons. | 174 Gallons |
Air Pol. | 12 over 11 tiles |
Water Pol. | 9 over 17 tiles |
Garbage Pol. | 4 over 0 tiles |
Processing Center is a Manufacturing Industrial Machinery Building that grows on Medium and High density Industrial Zones[1].
Machinery Buildings are grown by SimCity 4's Industrial Zones attached to an Anchor Lot and are designed to expand the base lot with major machinery installations. Machinery buildings are the second type of Industry building to be grown, preceded by Anchor Lots and followed by Outbuildings.
References
- ↑ Examplar: IM28x28_3ManuMech7_081A