Processing Center

From SC4D Encyclopaedia
Jump to navigation Jump to search
Lot Stats
ProcessingCenter.png
General Information
Creator Author: Maxis
Lot Size 2x2
Tileset Machinery
Stage M2 (One 2x3, One 3x2)
M3 (2x2, One 2x3, One 3x2)
Wealth Level I§§
Density
MD-I.png
M2 2x3
M2 3x2
HD-I.png
All
Occupants (§§) 48
Bulldoze Cost §150
Construction 15 days
Flammability 75
Fire Stage 3
Power Cons. 11 MWh
Water Cons. 174 Gallons
Air Pol. 12 over 11 tiles
Water Pol. 9 over 17 tiles
Garbage Pol. 4 over 0 tiles

Processing Center is a Manufacturing Industrial Machinery Building that grows on Medium and High density Industrial Zones[1].

Machinery Buildings are grown by SimCity 4's Industrial Zones attached to an Anchor Lot and are designed to expand the base lot with major machinery installations. Machinery buildings are the second type of Industry building to be grown, preceded by Anchor Lots and followed by Outbuildings.

References

  1. Examplar: IM28x28_3ManuMech7_081A