Cryo Testing
Jump to navigation
Jump to search
Lot Stats | |
---|---|
General Information | |
Creator | Author: Maxis |
Lot Size | 2x2, 2x3, 3x2, 3x3 |
Tileset | Outbuilding |
Stage | HT1 (3x3) HT2 (2x2, 2x3, 3x2) |
Wealth Level | I§§§ |
Density | |
Occupants (§§) | 30 |
Bulldoze Cost | §160 |
Construction | 16 days |
Flammability | 40 |
Fire Stage | 3 |
Power Cons. | 18 MWh |
Water Cons. | 15 Gallons |
Air Pol. | 3 over 5 tiles |
Water Pol. | 2 over 6 tiles |
Garbage Pol. | 4 over 0 tiles |
Cryo Testing is a High-Tech Industrial Outbuilding that grows on Medium and High density Industrial Zones[1].
Outbuildings are grown by SimCity 4's Industrial Zones attached to an Anchor Lot, designed to fill out the entire zone. Outbuildings are grown last and are designed to fill the spaces between Anchor Lots and Machinery lots.
References
- ↑ Examplar: IH14x24_1HTOut2_083F